Thursday, May 5, 2011

Top 10 Tank Barge Deficiencies—Part II

Excerpted from “Top Ten Deficiencies Found on Vessels.” Full text available on http://homeport.uscg.mil/. Navigate to missions/investigations/safety reports.

See Part I here.




Cargo Pump 46 CFR 32.50
Before inspection, owners/operators should look for (and repair) common deficiencies. Checklist:


  • Besides checking for obvious leakage, check the pump’s discharge pressure gauge.

  • The diesel’s water temp and oil press gauges must be in good working order.

  • Be sure the lagging on the diesel’s exhaust pipe is in good condition and its fan belt protective guard is in place.

  • Ensure that there’s a guard covering the reduction gear shaft assembly between the diesel and the pump.

  • Operating personnel must be prepared to demonstrate emergency shut-down procedures.

Vapor Control Components 46 CFR 39.20-1
Common deficiencies:


  • cracks and pinhole leaks in the vapor piping,

  • the half-inch diameter permanent stud on the vapor connection flange is often broken or missing.

Vessel Response Plan 33 CFR 155.1030, 1040 & 1060
The most common items that are either lacking from or not sufficiently addressed in the response plan are:


  • certification that response resources are able to respond to a “worst-case discharge,”

  • volume and type of oil that would be discharged in a worst-case discharge,

  • responsibilities of the qualified individual for immediate communication with the NRC,

  • vessel-specific information and the captain of the port zone information for the areas in which the barge will operate.
Owners/operators must use the “Homeport” web portal, http://homeport.uscg.mil/, to submit a response plan for approval. Click “help” and navigate to the “vessel response plan submitter.”

Cargo Control and Gauging Devices 46 CFR 38.10-20, 39.20-3 & 39.20-9
Owner/operator checklist:


  • If the barge is equipped with magnetically coupled rising-stick gauges, ensure that the sticks aren’t bent and that the markings on the sticks are legible.

  • If equipped with automatic-float continuous-reading tape gauges that are fitted with sight-glasses, ensure that no glass piece is cracked and that the assemblies are vapor-tight.

  • Be prepared to test the high-level alarms in the inspector’s presence.

Hull and Deck Plating USCG NVIC 7-68


  • Hull Plating. Inspectors typically find breaches in the hull plating as well as wastage of structural members. Occasionally an inspector notices a temporary repair that had not been previously documented.

  • Deck Plating. A common defect is a crack where a cargo tank’s main access trunk meets the deck.
Cargo Tanks


  • Leaking welds are sometimes found along the perimeters of bulkheads.


For more information:
For more information, contact your local Coast Guard Sector/Inspections Division. For a listing of sector offices, click on “Sector Map” on http://homeport.uscg.mil/.

Stay tuned for:
Top 10 Cargo Vessel Deficiencies

No comments:

Post a Comment

Comment Policy

We welcome your comments on postings at all Coast Guard sites/journals. These are sponsored by the U.S. Coast Guard to provide a forum to talk about our work providing maritime safety, security and stewardship for the American people to secure the homeland, save lives and property, protect the environment, and promote economic prosperity.

Please note: Anonymous comments have been disabled for this journal. It is preferred that you use your real name when posting a comment. WE WILL POST THE NAME YOU ENTER WHEN YOU SUBMIT YOUR COMMENT. Also, you are welcome to use Open ID or other user technologies that may be available.

All comments submitted are moderated and will be reviewed before posting. The Coast Guard retains the discretion to determine which comments it will post and which it will not. We expect all contributors to be respectful. We will not post comments that contain personal attacks of any kind; refer to Coast Guard or other employees by name; contain offensive terms that target specific ethnic or racial groups, or contain vulgar language. We will also not post comments that are spam, are clearly off topic or that promote services or products.

We will make our best effort to promptly post those comments that are consistent with the Comment Policy, but given the need to manage federal resources, moderating and posting of comments will usually occur only during regular business hours, Monday through Friday. Comments submitted outside of business hours will be read and posted as quickly as possible.